|
In Todd's map the mainline runs from bottom center to right center. The line up to Wilfley's is a spur.
I think the White Quail Smelter had already shut down by the time the C&S arrived. The Summit Smelter was serviced by the D&RGW, but in any case ran for only 6 months (in 1892/3) before being declared a failure and shut down. (The equipment was later moved to the San Juans, presumably to the Rose/Walsh Smelter.)
|