Re: Flanger Operation

Posted by Keith Hayes on
URL: http://c-sng-discussion-forum.254.s1.nabble.com/Flanger-015-tp19711p19905.html

Slow progress things weekend.

The blade is mostly done and grabs are on. I am practicing stirrup step fabrication techniques. That will leave the handrails and lifting/ signal mechanisms.

The idler only lacks stirrups and coupler lifting bars.

One more with the scratch built stirrups in place.

As with Mike's On3 models, these are fragile and demand a light touch.

Today was mostly devoted to advancing the PI Coal project.
Keith Hayes
Leadville in Sn3