Re: The Helix

Posted by Keith Hayes on
URL: http://c-sng-discussion-forum.254.s1.nabble.com/The-Helix-tp9915p16256.html

Today I laid out and cut the fascia. The large oval holes allow visual confirmation of the trains in staging and a check on the point alignment.

The track comprises the east end staging: points beyond Breckenridge. There are two lapped sidings,  one of which creates a loop to test equipment on.

The helix will be above this with the lowest level being exposed--  the track just west (south) of Solitude where the track starts the climb up Fremont.

Painting and turnout controls await, followed by more testing.
Keith Hayes
Leadville in Sn3