Following the C&S Railway from the rock wall to a telegraph pole (Part 4) video

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

Following the C&S Railway from the rock wall to a telegraph pole (Part 4) video

Kurt Maechner
Part 4 of this series follows the DSP&P/C&S route from the large rock wall to one of the few remaining telegraph poles along the line.  Numerous rock cribbing walls on the uphill side, most of which are still intact over a century after their construction, are pointed out as well as one stone culvert site and one wooden culvert site.

Enjoy!
Kurt